ПУП - ПЛАН ЗА ЗАСТРОЯВАНЕ - ФОТОВОЛТАИЧНА ЕЛЕКТРИЧЕСКА ЦЕНТРАЛА
All projects

Detailed Spatial Development Plan · Elin Pelin, Golyama Rakovitsa · 2022

Detailed Spatial Development Plan – Development Plan for a Photovoltaic Power Plant, Golyama Rakovitsa

42.6222, 23.8001

01 / Summary

Development of a Detailed Spatial Development Plan – Development Plan for the regulation and land-use planning of a territory designated for the construction of a photovoltaic power plant. The project creates the necessary planning foundation for realising the investment intent and the subsequent construction of the energy facility.

Location
Elin Pelin, Golyama Rakovitsa, Sofia District
Category
Detailed Spatial Development Plan
Period
2022
Role
Contractor
Client
Private individual
Status
Completed
02

What was done

A Detailed Spatial Development Plan – Development Plan was developed for the construction of a photovoltaic power plant. Full design and administrative handling of the procedure was carried out — from the research and land-use planning of the territory to the approval of the project with the competent institutions and the procedures related to the change of designation of the agricultural land.

03

Scope

A Development Plan was prepared, defining the planning zone, parameters and development regime for the construction of a photovoltaic power plant. The project included research into the territory and the existing planning conditions, development of the necessary graphic documentation, and communication and coordination with the competent institutions and utility companies. The project also includes the necessary actions for changing the designation of the agricultural land and for approving the planning procedure, in order to create the necessary foundation for realising the investment intent.

04

Result

The necessary planning and administrative foundation was created for the construction of a photovoltaic power plant on a territory with a changed designation. The development of the Development Plan and the completion of the necessary approval and administrative procedures provided the opportunity for subsequent investment design and construction of the facility.